top of page
Mike Marquez

East Natomas Education Complex
In 2010 The Twin Rivers Unified School District paused construction during a merger restructure, leaving the site with foundations and much of the steel structure already in place. Working alongside PBK Architects, I conducted a study to determine how to best utilize the existing elements. As part of this process, I developed a site model of the current conditions and designed buildings that maximized the existing infrastructure to create a comprehensive high school for 3,000 students.
Mike Marquez: Project Designer





bottom of page